Change set

Pick exam & year, then Go.

Question map
Not attempted Correct Incorrect ★ Bookmarked
Loading…
Q72 (UPPCS/2024) Geography › Indian Economic Geography

Which one of the following pairs is not correctly matched regarding peculiarities of Ramganga project ?

Explanation

The Ramganga Project (also known as the Kalagarh Dam) is a multipurpose river valley project on the Ramganga River. Based on official data from the Uttarakhand Jal Vidyut Nigam Limited (UJVNL) and the Irrigation Department:

  • Dam Length: The length of the main dam is approximately 630 metres (and the height is 128 metres). The figure of 825.8 metres mentioned in Option A is incorrect.
  • Hydropower: The power station has an installed capacity of 198 MW, consisting of 3 units of 66 MW each.
  • Location: The dam is located at Kalagarh in the Pauri Garhwal district of Uttarakhand.
  • Irrigation: The project provides irrigation to a command area of approximately 5.75 to 5.9 lakh hectares (commonly rounded to 6 lakh hectares) in Western Uttar Pradesh.

Therefore, pair A is not correctly matched.

✓ Thank you! We'll review this.

SIMILAR QUESTIONS

CAPF · 2013 · Q48 Relevance score: 4.87

Which of the following pairs are correctly matched? 1. Idukki : Thermal Power Station 2. Sabarigiri : Hydroelectric Project 3. Ghatprabha : Irrigation Project 4. Ramganga : Multipurpose Project Select the correct answer using the code given below.

IAS · 1996 · Q54 Relevance score: 4.24

Which of the following pairs are correctly matched ? I. Idukki ... Thermal power station II. Sabarigiri ... Hydro-electric project III. Ghatprabha ... Irrigation project IV. Ramganga ... Multipurpose project Select the correct answer by using the codes given below : Codes :

IAS · 2010 · Q124 Relevance score: 3.04

Which one of the following pairs is not correctly matched ? Dam/Lake River

UPPCS · 2025 · Q147 Relevance score: 2.91

Which of the following pair is/are NOT correctly matched ?
(Dam) (River)
1. Baglihar Dam - Chenab
2. Pandoh Dam - Ravi
3. Srisailam Dam - Tungabhadra
Select the correct answer from the code given below :
Code :

NDA-II · 2014 · Q48 Relevance score: 2.53

Which one of the following pairs of power projects is not correctly matched?