Q108 (CAPF/2008) Geography › World Human & Economic Geography › World trade and transport Answer Verified

Which of the following are connected by over 1700 km-long BTC oil pipe-line ?

Result
Your answer: —  Â·  Correct: D
Explanation

The Baku–Tbilisi–Ceyhan (BTC) pipeline is a major international energy corridor that spans approximately 1,768 km in length [1]. It is specifically designed to transport crude oil from the Caspian Sea region to global markets via the Mediterranean Sea. The pipeline originates at the Sangachal terminal near Baku, Azerbaijan, on the shores of the Caspian Sea, traverses through Georgia, and terminates at the Ceyhan marine terminal on the Turkish Mediterranean coast. Completed in 2005 and becoming fully operational in 2006, it provides a strategic export route for Azerbaijani oil (from the ACG fields) as well as crude from Kazakhstan and Turkmenistan, bypassing the congested Turkish Straits [1]. By linking the landlocked Caspian region directly to a deep-water Mediterranean port, it serves as a vital link in world trade and energy security.

Sources

  1. [1] https://minenergy.gov.az/en/neft/baki-novorossiysk-neft-kemeri
How others answered
Each bar shows the % of students who chose that option. Green bar = correct answer, blue outline = your choice.
Community Performance
Out of everyone who attempted this question.
63%
got it right
✓ Thank you! We'll review this.

SIMILAR QUESTIONS

IAS · 2024 · Q88 Relevance score: -4.64

Consider the following statements : Statement-I : Sumed pipeline is a strategic route for Persian Gulf oil and natural gas shipments to Europe. Statement-II : Sumed pipeline connects the Red Sea with the Mediterranean Sea. Which one of the following is correct in respect of the above statements ?

CDS-I · 2004 · Q116 Relevance score: -5.37

Keil Canal links the

IAS · 2005 · Q122 Relevance score: -6.29

Which one of the following pairs is not correctly matched?